The Straw House Blog

project_sample1

The House in Pictures

I’ve put together an overview in pictures of the house from the day we broke ground (August 2002) to when we moved in (May 2003).


     

project_sample1

Roofing Part One

The cupola is covered. Yippee!! No more annoying drips down the back of your neck as you work in the front. Tomorrow they start on the back portion, but it’ll take much longer to do that - they’re expecting to spend the next two days on it. Mike and Rich came out from MG Construction, really nice guys, good humoured and very easy to work with. Interestingly enough they have put quite a few roofs on straw bale homes, they are VERY impressed with our walls, they say that the other houses that they have worked on have had very uneven walls, real rough work. So cudo’s to Camel’s Back! Much as I’d like to take the credit it belongs to the care taken by Pete, Tina, Stephen and Andrew (who incidentally didn’t work on those other houses).

Meanwhile Jo and I worked on insulating around the windows. The big problem is that the expanding foam doesn’t work very well in this cold.  The other issue is that some of the gaps are quite large and don’t fill up well with foam, or else take a great deal of foam, those Joanne has been (carefully) stuffing with cut off chunks of Roxol.

In the morning Dad and I ran the last of the main electrical wiring. Next we have to run the wire for all of the various switches, plus there’s a good bit of work to do in the back room.