The Straw House Blog

project_sample1

Half a Fine Day

We had Mike and Dave for only half the day today so we started at 8am. It was warmer than it has been for a while and we set them to work on trimming the back beam and setting up the boxes for the back windows. Meanwhile Rene finished up the fascia board and put up blocks for the ceiling drywall. I helped Dad, helped Mike and Dave, and shovelled the last of the snow off of the roof.

Jo and my Mom stayed behind in Omemee and put another coat of stain on our doors. When they arrived at the land Jo and I took off for Peterborough and bought our chimney and flashing. We’re going to install the chimney now, so that the roofers can flash the whole thing in properly. We don’t really know for sure when we’re going to put in a fireplace or wood stove.

When we got back Eric had arrived and was in the process of installing our wind tower anchors at the top of the hill. He carried two anchors at a time in the bucket of his backhoe. So we’re ready to get the wind tower installed. As an added bonus Eric’s coming back tomorrow to install our septic tank and cut the trench from the well to the house. Things really seem to be rolling along! It’s very exciting.

All of the pictures are of Eric installing the anchors.