12 weeks?! Maybe not.
Good day for scheduling today. Most of the appliances got delivered, and, BIG NEWS, the shower base is going to be delivered tomorrow. It was supposed to be 12 weeks but turned out to be more like 6. Once we have the base in place we can order the glass and fibreglass the back wall. We may not have to bathe in the bathtub after all.
Pete and Tina continued cleaning, and fixing up the interior walls. They stucco’d one section, and they hope to get two sections done per day. Their tools for smoothing the cement walls are quite incredible. The first tool is basically a brick with grooves cut along the bottom and attached to a handle. That sucker really works your arms (or so Tina tells me). The second is a flat sander with carbide teeth set at about a #10 grit. And people wonder if the coating on the bale walls is strong enough.
Meanwhile Dad, Phil and I hung drywall on the back wall ceiling - which, incidentally, is a difficult and seriously crappy job. Later I put the last coat of mud on the kitchen walls, and right before I left I applied another coat to the back bathroom. Then I ran out of mud (oh, darn) and had to stop (drat).
Pictures? You want pictures? Fine.