It gets worse before it gets better
We still don’t have heat. But we do have a leak in the radiant system - under the slab. Looks like when the Dave’s put in the back bathroom walls they decided to nail them down to the floor. They had been told not to, and when they built the front bathroom walls they glued them down, but apparently they forgot when they did the other walls. [CORRECTION: The leak was not caused by a nail, it was caused by a rake when the slab was poured. My apologies to the Dave’s. The leak just looked like it was coming out from under their wall.] So now that we know where the leak is we have to break a hole through the concrete and patch the pipe. No I don’t know how they patch the pipe, but Dan does and that’s all that matters. We’re just damn lucky though, that the Dave’s only managed to nail one pipe… sorry I couldn’t resist the pun.
Today Simon and JP finished up the electrical system. The solar panels are up on the roof and are charging the batteries. We also have a pig-tail off the charger so that we can use the generator to supplement the panels. The solar hot water panels are up on the roof as well, but they aren’t plumbed in yet.
Dan’s coming back Saturday to finish up his stuff. Rene’s coming to help finish the insulation, and Dad and I are going to finish the electrical conduit, and apparently break up some concrete.