Mid-week Update
There’s a lot going on this week, the roofers are back putting on the fascia and soffits. The plumber should be making his way in to connect up our plumbing. It’s bad enough going in the bushes when it’s cold out, the women have made it very clear that no plumbing in black-fly season will not be acceptable. The Wiremold conduit for the perimeter electricity, phone and data is ready for pick-up, as is our glass for the bathroom doors and windows and back room door.
Now we’re having fun with Bell Telephone. Two years ago when we started this whole thing we called Bell and they came out and told us that they could run the wire, and it would cost just over $2K, they actually sent people out who measured the driveway. Bell pays for the first 165 metres, our driveway is 900 metres long, $2K didn’t seem like much. I called them on Monday to get that particular ball rolling, and of course the whole thing began to unravel. An engineer came out today and she told my father that she isn’t even sure they can run a phone line that long… uh pardon? She’s going to go back to find the original file and see what they told us and why. Great. They did reserve our phone number though and it is a seriously kick ass number. The kind where you hear it once and it’s memorized. It’ll be really great, if we ever get a phone.
Remember folks building a house is a full contact sport. Do not forget your cup.