The Straw House Blog

project_sample1

Ohhhh, more holes…

Alas, no concrete today, but the forms are in and the inspector will be inspecting tonight. I have been assured that the concrete will flow tomorrow. My father said he’ll go down to take pictures (holes with concrete!!)

 

We also met with the fine fellows from Generation Solar (Simon & JP) as well as our plumber (Andrew), they sync’ed up on the hot water stuff which was good. Then Simon and JP measured from the top of the back hill to the house 215m (670’). So it looks like we’ll be putting the wind tower at the back of the big hill. The only drawback is digging the 215m trench for the electrical conduit.