
Poured the Floor
We poured the floor today. Rick Russo and his crew did a fine job, of pouring and smoothing 34 cubic metres of concrete. We had the concrete tinted a brown/tan colour and the results look fantastic.
We also filled our anchor forms (built by my father) that will be carried up to the top of the back hill and used to anchor the wind tower guy wires.
Tomorrow Jerry and his crew will be starting on the post and beam, so we are on track for our straw bale deadline. Things are looking pretty darn OK.