Scotty! I need more time!!

There just isn’t enough time in a weekend. It’s a cliche I know but it has never seemed more true than now. I have got to start taking a day or two a week and heading up to the land to get stuff done. I just can’t get enough done in two days.

We did have a very good weekend though. Dana came by today and provided a great deal of help to Joanne who was quite sick. Except for a final sanding the bathroom is drywalled. We have a bunch of the drywall up in that back portion as well as the between room insulation (for fire retardation and sound proofing).

Dad and I started putting up the barn boards on the outside wall of bathroom. This wall faces on to the mudroom immediately adjacent to the front door. This is the only part of the house that will appear ‘old’ (since our style is definitely modern). The bench in the mudroom will be made from one of the original barn beams. The mudroom will be our homage to the barn. We started to run out of boards though so Dana and I went out and I climbed up to the top of the barn. Between the two of us we got the rest of the boards down and into the house. We’ll leave them stacked for the week to dry and equalize with the house humidity.

Mom (bless her heart) continued the thankless job of cutting and taping the vapour barrier. Someday she’ll be done.

We saved the dog walk for Dana. When she got there Dana and I strapped on the snowshoes and took the dogs out. We got more snow last night. The snow is now deeper than the dog’s shoulders, they can really only walk by following in our tracks. We could just walk them along the road but twenty minutes through the bush is better than an hour on the road. This was also the first time that Dana has done any real snowshoeing, talk about your trial by fire! She did very well.

 

 

The big jobs left at this point are planing and routing the cedar for the bathroom, but since we have to do that in Dad’s unheated garage we prefer to wait for the temperature to get nearer to zero. Then we have to install and stain the cedar. When that is done we can finish the plumbing and start on the kitchen. At the same time as we’re finishing the bathroom we can do the final coat of interior stucco, installation of the Wiremold baseboard, and finish the the drywall and other various trim type jobs. Somehow I don’t think we’ll be installing the windmill for a couple of months.