The Problem with Three-Ways

So the fun with wiring continues. Dad and I keep disagreeing on how to wire up three-way switches. Dad thought there was a problem with a switch and re-wired it but while it worked, it wasn’t right. This morning we set out together and we re-wired every single light and three way switch in the house. We now have working lights in the back rooms, and the mud-room, plus proper switched power to the front and back door exterior lights. Paul (the architect) lent us a book about the electrical code and we just wired everything up with the book open in front of us, saved arguing, and everything works. We’ll hook up the other lights as we acquire them.

The heat is lovely, we leave it set at about 17 degrees, and even though we’re having some troubles with the inverter, the house can stay warm through the night with no heat. Which is good since both Dad and I have walked into the house in the morning and found the inverter off and displaying an unknown error. However, after a quick look through the manual (RTFM ya’ know), Dad discovered that there is a way to display the type of error that has occurred. So maybe tomorrow, if there’s a problem again, we’ll be able to figure out what’s going on. Now wouldn’t that be exciting?

We’re just working on small stuff around the house these days, for a whole variety of reasons we’ve sort of slowed down while we get a grip on things. We’re nearing the end of the project and there’s not quite as much money left as we’d hoped, and we feel like we’ve been on a runaway train with rushing to get everything done. Now that we have heat we can slow down, take stock, and get all of the last stuff done right.

So Mom’s been taping the seams in the vapour barrier, Dad and I are working on electrical, caulking, the bathroom, and figuring out how all of of new high-tech systems work.

The next goals are sealing the concrete floor, doing the final coat of stucco on the inside, and running the conduit around the perimeter. Then we have to finish the plumbing, finish the inside the bathroom, and then the kitchen. After all that, maybe, just maybe, we move in. It doesn’t seem that far away now…