The Straw House Blog

project_sample1

A Day of Adventures

...and more tours. Glen and Ron did a huge clean up job in the morning and Donna and I joined to help. The place looked fantastic, and our plan to move in a few weeks didn’t seem so crazy. Just as Glen and Ron were unwrapping the fridge and getting it ready to plug in, my Mom and Dad arrived (Anna and Nick) for the birthday/Mother’s day celebration. Then it was more tours as Ron and Donna’s neighbours Jim and Michelle stopped by with their kids and some friends.

My sisters and their families arrived a short while later and wandered around exclaiming “It’s so much bigger than it looks on the web!” After a great lunch Glen and Ron took Karen and Bob and their boys Tommy, Andrew and Matthew and Kim and Gene’s daughter Claire on their first adventure past the gravel pit and up the big, back hill. Then they headed through the west bush, along the logging road to the fields and back along the Porcupine trail where they discovered the “mushy, trampoline” part, where you walk on cedar tree roots. Donna, Mom, Dad Kim and Gene and I stayed and played with their adorable younger daughter Kate. After cake and some wonderful birthday/Mother’s Day gifts, I took the three boys and Claire on the next adventure - over to see the dead porcupine. Then it was back along the Porcupine trail.

Altogether it was a fun day with gorgeous spring weather. At the end of the day Glen put the shelves in fridge. It really started feeling like a house with the fridge in place with food in it! 

Somehow in all the confusion, pictures got taken.

     

project_sample1

Happy Birthday Jo

Yep, today’s her birthday. I’m not telling how old.

Pete and Tina got two sections done today, they’re back on Monday. Phil brought Joanne up, helped put up one piece of drywall, helped bring in the shower base, and then had to leave to go to a job interview. He got the job, but it’s a night gig so he says he can still come out and help us. We need the muscle.

For some reason Dad really wanted to have the kitchen lights up in time for the tour today. To get the lights up they had to be rewired, which involved cutting off the old leads and soldering on new wires. We removed the metal rods and hung the lights from the new wires. They look amazing, and we’ll leave them up for tomorrow, then take them back down to protect the glass.

The tour took up a good portion of the afternoon, so we didn’t really get much work done. Everybody seemed quite impressed with the house and the land.

 

project_sample1

12 weeks?! Maybe not.

Good day for scheduling today. Most of the appliances got delivered, and, BIG NEWS, the shower base is going to be delivered tomorrow. It was supposed to be 12 weeks but turned out to be more like 6. Once we have the base in place we can order the glass and fibreglass the back wall. We may not have to bathe in the bathtub after all.

Pete and Tina continued cleaning, and fixing up the interior walls. They stucco’d one section, and they hope to get two sections done per day. Their tools for smoothing the cement walls are quite incredible. The first tool is basically a brick with grooves cut along the bottom and attached to a handle. That sucker really works your arms (or so Tina tells me). The second is a flat sander with carbide teeth set at about a #10 grit. And people wonder if the coating on the bale walls is strong enough.

Meanwhile Dad, Phil and I hung drywall on the back wall ceiling - which, incidentally, is a difficult and seriously crappy job. Later I put the last coat of mud on the kitchen walls, and right before I left I applied another coat to the back bathroom. Then I ran out of mud (oh, darn) and had to stop (drat).

Pictures? You want pictures? Fine.

     

A block of time

Happy times for the next week or so, I launched two sites yesterday, the RCMP Veterans Association Store and a stub page for Scott Morris Architects full site to come soon. I’m taking the next 5 days off to work on the house, next week Jo and I have our first appointment with the doctor in Peterborough. This is our temporary doctor, she’s helping us only until the baby is born, then we’re SOL. The doctor situation outside of Toronto is really bad.

Pete and Tina are in the house again, applying the final coat of plaster to the interior walls. We’re mixing the plaster with white marble dust, it should look pretty cool. Another nice thing about working with Pete and Tina is the music. Music is delicate balancing act in the house, the trick is to find stuff that is enjoyable and good to work too, but doesn’t offend my parents. They’re pretty accepting of most light country, acid jazz, and light rock type music, and Paul Simon. We’re starting to get a bit tired of those albums. So after my Dad left today we threw on the new White Stripes, Elephant, which seriously kicks ass. After that David Holmes’ Bow Down to the Exit Sign. Both great albums to work with.

This week we also have one group of my parent’s friends coming through on Friday and Joanne’s whole family comes up to celebrate her birthday. Somehow I don’t think we’re going to get a bunch of work done those days.

Pete was saying that some of the straw bale house owners he knows have gotten so sick of the constant stream of visitors they have started charging admission. Another house only allows visits one day a month. I wondering if we’re going to get that frustrated. We get about one visitor per weekend, usually neighbours, who we enjoy meeting, but occasionally we get strangers who’ve just heard of the house and are curious. Those people we’re a bit less happy about. We’ve also learned that for most people, a No Trespassing sign is pretty meaningless.

     

project_sample1

Tour Day

We really didn’t get much work done today. Mom did some sanding and Dad and I worked on the drywall. Just after lunch friends from Toronto came up, with Joanne. David and I worked together over the last year or so, and he came with his wife Angela and super cute daughter Veronica. We toured them through the house and around the land. A good time was had by all. Seeing parents like them (ie good calm together parents) gives me hope that this whole kid thing will be OK. Veronica loved the dogs and had an altogether splendid time wandering about the the land exploring. She was a treat.

As we were walking back to the house Steven and Laurie pulled up with their wee daughter Malaika. Malaika is just two months old. She basically slept the whole time, but even so she held her own in the cuteness department.

Then they left, and the Morton’s came buy. We bought the land from Hector Isaac Thorton Morton. His nephew is Anson Morton. Anson’s sons Randy and Kevin farm the front 25 acres of our land. They live just up the land, you can actually see their place from ours out the front door. Anson told us stories of the area and his family. His father and uncle built the barn on our land. His father was born in the house on the 100 behind us. It was a nice visit.

But we got nothing done this afternoon. Jo took some pictures though.

     

project_sample1

Rube Goldberg came to our house

Well you should see our mechanical room now. We have great soaring pieces of pipe, a panoply of pumps and pressure tanks all humming and burbling in their own ways. Evidently Simon ran into some trouble on Friday as the solar hot water system is still in pieces. Nothing involving fluids seems to go well at our place.

Here’s the way the system works. There is a submersible pump in our well which is 53 feet deep. The well controller runs off its own 48 volt line direct from the batteries. The pump feeds into a 30 gallon pressure tank which feeds our domestic water.

The hot water tank is actually a heat exchanger with two sets of coils. Both coils are closed loop sub-systems. The lower set of coils is fed from the solar hot water system. A glycol/water mixture runs up through the panels and then back down through the heat exchanger. The pump for that loop is fed from a panel tacked onto the side of the main panels. We call it the “pimple panel”.

The upper loop is fed from the propane boiler, which is capable of producing 140,000 BTUs. The upper loop heats both the domestic water and the radiant floor system. There is an aqua-stat on the side of the tank, if the solar hot water system hasn’t pre-heated the water sufficiently, the aqua-stat makes a request to the boiler and it starts to circulate its glycol/water mixture through the top loop. The radiant floor system is controlled through a pair of thermostats in the house and a pair of aqua-stats on the return side of the floor loops. If the ambient air temperature inside the house drops, or if the return mix temperature drops too low the boiler will fire and the floor pumps will start.

If it sounds complicated don’t worry, it’s much much worse when you look at it.

 

project_sample1

I was gonna rant…

... but now I’m not. I had a big ol’ rant prepared on the age old topic of contractors who don’t show up. Except it turns out he showed up, at night, after we had left. Now I could deliver a mini rant on the subject of contractors who don’t call, but really I’m just happy to find out that the work is done.

On Wednesday my cousins Steve and Phil came up to help. Steve’s in visiting from Vancouver and it was the first time he’s seen the house. He seemed really impressed with the place, and with the land. Being city boys we all have trouble with the scale of 100 acres, Steve and I walked around a fair bit, but he seemed a little overwhelmed. Steve is a few years older than I am, when I was younger I worshipped him. He used to take me to see the Star Wars movies when they came out, and he loaned me his Eurhythmics, Human League, Heaven 17, and Thompson Twins LPs and 12"s. He dressed cool and he moved out when he was 17. That was a long time ago, but Steve and I have grown to be good friends so I was very excited to have him come out to visit.

His brother Phil (who is 5 years older than Steve) loaned me his Frank Zappa, Steely Dan, and Lynyrd Skynyrd albums. Steve and Phil more than anything else are responsible for shaping my adolescent musical tastes. Phil is far more handy than Steve, he helped us hang drywall, and hopefully he’ll be back next week to help hang more. We might even get him mudding.

We gave our notice two weeks ago and the landlord has already rented it out for June first. So we really are committed. Everything now is a milestone, everything is another immediate step towards the big move. This week we put up the mailbox, got most of the plumbing done, sanded a bunch more beams, urethaned the outside of the bathroom, put up drywall, and did a bunch of electrical work.

In addition Simon was in to plumb up the solar hot water system, and Dan Peel rewired the the radiant system to use thermostats out in the house in addition to the hydrostats on the return loops. The boiler has been replumbed so that it supplies hot water to the heat exchanger, and all of the pumps have been configured to work independently depending on whether the request for heat comes from the floor system or the tank.

They’re late but here are the pictures from Wednesday.

     

World of Ends

If you haven’t seen this and you’re at all interested/involved in Internet stuff please go give it a read. It’s well worth ten minutes of your time.

World of Ends

     

Because building the house wasn’t exciting enough

Ooops, I forgot to mention that Joanne is pregnant and that we’re expecting our first child in October.

Sorry to interrupt. Please carry on…

     

project_sample1

Rainy day, dream away

We have a mailbox now. Amazingly the post office has been the least bureaucratic group we’ve had to deal with (so far). Their criteria for starting mail service is: install a mailbox, put your name on it, call them. Oh, and the mailbox may not be more than 42” off the ground. So tomorrow I will put my name on it, and call them.

One of the things I really like about the country is how neighbours really do go out of their way to help each other out. Randy and Kevin Morton who farm our land, and hunt on our land, and whose great-uncle we bought the land from, came down with their post-hole digger to help us install our mailbox. We used a cedar post leftover from our cut two years ago.

Nick spent the night with us at my parent’s place, and was back sanding at 10am. He sanded pretty much non-stop until 5:30pm. His whole body must have been vibrating at the end of the day. He got most of the cupola done and he’s staying over again tonight so that he can finish the rest tomorrow. It’s a crappy job and we’re very thankful that he’s up there doing it.

Dad and I worked on a whole variety of small tasks around the house including,  installing the locks on the bathroom door, some plumbing work, a bunch of electrical work and a whole heap of planning.

Tomorrow we’re going to have a seriously busy day as we are expecting visits from Simon to install the solar hot water system and fix our water pump, Dan Peel to change the radiant system over to air temperature thermostats, Andrew Green (the plumber) to fix a couple of problems and finish the dog bath and bathtub (human bath), and last but certainly not least my cousins Phil and Steve are coming up. This will be the first time that Steve has actually been up to the house.